Welcome to Sand & Gravel Direct

Telephone: 0845 8726446

E-mail: Info@sandandgraveldirect.co.uk

  • 100% PCI Compliant for SAFE card transactions... Please call for Large Orders

  • Please complete our Feedback form, this will improve our service and site... Discounts offered for account holders

  • Sign up for an account to benefit from special deals... We are 100% Customer focused

×

Registration

Profile Informations

Login Datas

or login

First name is required!
Last name is required!
First name is not valid!
Last name is not valid!
This is not an email address!
Email address is required!
This email is already registered!
Password is required!
Enter a valid password!
Please enter 6 or more characters!
Please enter 16 or less characters!
Passwords are not same!
Terms and Conditions are required!
Email or Password is wrong!

Driveway, Garage / Shed Base & Conservatories

Driveway, Garage, Shed base

Driveway, Garage / Shed Base

Measure the Length and Width of the area you wish to use.

You will need to excavate a minimum of 200mm. This is the minimum make up

You will need to build a frame for in the excavated area to stop the side walls from caving in.

The ground underneath needs to be weed free and it is recommended you prepare the ground ( soil) by making it as flat as possible. Use a rake to level out any imperfections and place the frame in the excavated area checking it is level.

It is recommended you allow for a minimum of 100mm of hardcore / Type1 for the base. This needs to be compacted fully using a machine you can hire called a Wacker Plate. This compacts the material to its maximum. If this is not compacted correctly this can cause problems with the area in the future.

On top of the Hardcore it is recommended a minimum 100-150mm of Concrete.

Please contact Sand and Gravel Direct to assist you in the correct concrete mix for the right application.

Concrete should then be poured be compacted using a concrete poker or a length of wood wider than the width of structure you are filling. The length of wood needs to be lifted and gently bounced on the top of the concrete (this helps to remove air trapped in the concrete). Use the wood to slowly and gently bounce and drag the concrete towards you. The length of wood needs to be on top of the frame to ensure your concrete is level.

Concrete will need a minimum of 7 Days to set (cure) and then can be lightly trafficked. After this time the concrete will still continue to get stronger.

There are a variety of concrete mixes available, Please contact Sand and Gravel Direct for assistance in choosing the correct concrete mix for the right application.

Sand and Gravel direct are able to offer support on Ready to use Concrete and a Concrete pumps if the project is at the rear of the property or difficult to access.


Please use the calculator on this page to assist you in working out the quantity of material required for your project.

Driveway / Shed Base

Enter Your Requirements

  • Meters

     

    Meters

     

  • Millimeters

    Min 100mm

    Millimeters

    Min 100mm

  • big equal
  • 57 Tonnes of Hardcore/Type 1 Required

    48 Cubic Meters of Concrete Required

Patio Paving Chart